vertical gap is too large Ground, wall, but also with cement mortar for leveling treatment. Shop before the color difference of the tile. 2, wall tiles to full flooding As the wall brick has a high moisture content, in the paste must take into account its characteristics. Tiling before the grass-roots should be fully watered, otherwise, the moisture in the mortar is the rapid drying of the grass-roots and rapid absorption of ceramic tile will affect the bond fastness. Otherwise, the wall will absorb moisture from the cement, the
cement can not play the role of adhesive. 3, tiles to be paved the first floor of the ground will not be coated with cement tiles on the ground, knocked, the cement slurry coated with floor tiles, shop on the ground, four brick diagonal position flush. The laying of the order also pay attention to. Tiling should be from the inside to the outside, such as the ground slope or floor drain, should pay attention to find the direction of drainage by the drainage; wall should be paving from the bottom up, for aesthetic purposes, the
bottom of the brick should be posted. After the wall tiles and then press the floor tiles. In addition, a wall can not be attached to the top of the first, to prevent the larger tile weight, causing collapse. Shop floor tiles do not step on a short time. 4, the tiles as much as possible soak in the summer, because the material is more dry, so the floor tiles, tiles and other materials need to be treated by foam water, to extend the soaking time, so close to the saturated water state. In this way, it will not appear in the adhesive when