Members Login
Username 
 
Password 
    Remember Me  
 

Topic: Qingyang Road construction steel pier step

Post Info
Guru
Status: Offline
Posts: 695
Date:
Qingyang Road construction steel pier step
Permalink  
 

Green Ocean Road quickly across the main engineering Wujin Avenue Bridge completed the top outer pier pier expansion vase SQUARE first piece construction, which not only marks the formal transfer of the bridge structure construction above ground, but also marks the "no pier reinforcement bracket construction technology "in the construction of roads and bridges in the area of ??the first successful use. "No pier reinforcement bracket Construction Technology" in the implementation of the project "reinforced centralized processing factory" (Standardization Administration of one of the measures) on the basis of the design with nice wide pier top extended vase SQUARE pier the pier steel production module factory, in a large reinforced each section provided a centralized processing plants within the molding, the scene without lifting the whole steel stents. Since the reinforcement module production factory, will soon be put together with CNC steel processing equipment, steel banding and makes installation accuracy is improved greatly, and the past "only embedded pier reinforcement, erection of late stent pier steel air banding" traditional pier compared construction steel column, not only reduced the amount of on-site scaffold erection work, greatly reducing the process of security risk, but also greatly shortened the pier operating time. It is reported that this process will promote the use of the entire Green Ocean Road quickly engineering projects.

Related Sites:
flexible filler for cracks
crack sealing option
using infrared for pavement preservation
best backpack blower for parking lot



__________________
qweqwwe
 
Page 1 of 1  sorted by
Quick Reply

Please log in to post quick replies.



Create your own FREE Forum
Report Abuse
Powered by ActiveBoard